Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Secunderabad, Telangana as an EPC contractor: engineering, supply, construction and commissioning.
What Telangana's policy says about large solar plants
The Telangana Clean and Green Energy Policy, 2025 is the state's current policy for solar and other renewable projects. The Energy Department issued it on 11 January 2025, and it stays in operation for 10 years from that date.
Under TGERC's Terms and Conditions of Open Access Regulation, 2024 (Regulation No. 1 of 2024, gazetted 18 March 2024, amended on 24 January 2026), a consumer with a contracted demand or sanctioned load of 100 kW or more can take renewable power through green energy open access. For other open access, consumers above 1 MW are eligible, and the Commission will open it to 1 MW and below in phases.
The charges, exemptions and conditions for Telangana are on the page Utility-Scale Solar in Telangana.
Output and land at megawatt scale in Secunderabad
A solar plant in Secunderabad is modelled to produce about 1,400 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (23°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 70.0 lakh units | 20 to 25 acres |
| 10 MW | 1.40 crore units | 40 to 50 acres |
| 25 MW | 3.50 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Secunderabad
These are the Somaya Solar projects closest to Secunderabad, with straight-line distances. They are shown as references and are not in Secunderabad unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 730 km from Secunderabad. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1270 km from Secunderabad. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Secunderabad
Which electricity company handles solar connections in Secunderabad?
Southern Power Distribution Company of Telangana Limited (TGSPDCL) supplies electricity in Hyderabad district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Secunderabad?
About 1,400 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.0 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Secunderabad?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1240 km from Secunderabad in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 730 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Secunderabad
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TGERC Terms and Conditions of Open Access Regulation, 2024 (Regulation No. 1 of 2024) and First Amendment Regulation, 2026 (24 January 2026); TGERC orders on additional surcharge for H1 (10 March 2026) and H2 (30 October 2026) of FY 2026-27
- TGERC common order of 10 July 2026 (TGRPDCL), paragraphs 1.24 and 1.25
- Telangana Clean and Green Energy Policy, 2025, G.O.Ms.No.2 (Energy Department), dated 11 January 2025