Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Secunderabad, Telangana. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Secunderabad
The Government of India's One District One Product (ODOP) list names Studded gold jewllery as the product of Hyderabad district.
Metering rules for business rooftops in Secunderabad
In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.
The size limits, charges and other conditions for Telangana are on the page Commercial & Industrial Solar in Telangana.
In Secunderabad the application for connection and metering goes to TGSPDCL.
Output and bill value for a rooftop plant in Secunderabad
A solar plant in Secunderabad is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry General, 11 kV energy charge of ₹7.65 per unit (TGERC Retail Supply Tariff Order for FY 2026-27, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹7.15 per unit at 33 kV and ₹6.65 at 132 kV and above. It is the same for TGSPDCL and TGNPDCL. A demand charge of ₹500 per kVA per month also applies. It is charged on the maximum demand recorded in the month or 80% of the contracted demand, whichever is higher. A minimum energy charge of 50 kVAh per kVA of billing demand per month applies. Time-of-day: plus ₹1.50 per unit from 6 am to 10 am and 6 pm to 10 pm, and less ₹0.50 per unit from 10 am to 6 pm. Fuel surcharge adjustment is extra, and the rates exclude electricity duty.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.65 per unit |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.5 lakh |
| 250 kW | 3.4 lakh units | 2,500 sq m | ₹26.2 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹52.4 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹1.05 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Secunderabad
These are the Somaya Solar projects closest to Secunderabad, with straight-line distances. They are shown as references and are not in Secunderabad unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1160 km from Secunderabad. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1300 km from Secunderabad. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1380 km from Secunderabad. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Secunderabad
Which electricity company handles solar connections in Secunderabad?
Southern Power Distribution Company of Telangana Limited (TGSPDCL) supplies electricity in Hyderabad district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Secunderabad?
Net metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers. The rule is the same across Telangana.
How much electricity does a solar plant generate in Secunderabad?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Secunderabad?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1240 km from Secunderabad in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1160 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Secunderabad
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TGERC (Rooftop Solar PV Grid Interactive Systems) Regulation, 2025 (Regulation No. 1 of 2025), Telangana Gazette of 15 November 2025; TGERC proceedings of 29 December 2025 on the settlement rate
- TGERC Retail Supply Tariff Order: FY 2026-27, Appendix A (Abstract of the Retail Supply Tariff for FY 2026-27), pages 289 to 294
- TGERC common order of 10 July 2026 (TGRPDCL), paragraphs 1.24 and 1.25