Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Telangana. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Metering rules for business rooftops in Telangana
In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.
- The 2025 regulation repealed the earlier Regulation No. 6 of 2016 (net metering) and its amendments. Existing net metering users above 500 kWp keep net metering.
- Under net metering, if a consumer exports more than it imports in a billing period, the excess units are paid at the lowest tariff of the solar power purchase agreements the distribution companies signed in the previous financial year. They are adjusted in the next bill or paid into the consumer's bank account.
- A TGERC proceeding of 29 December 2025 sets this settlement rate at ₹2.57 per unit, from the date the regulation was notified until the Commission issues a new proceeding.
- Under gross metering, the distribution company buys all the solar energy at the same rate and bills the consumer separately for all its consumption.
- Group net metering is open only to domestic (LT-I) consumers and townships and residential colonies, below 100 kWp. Virtual net metering is open to all categories except temporary supply, below 100 kWp, for participating consumers of the same category in the same licensee's area.
- The total rooftop capacity on one distribution transformer may not exceed 50% of its rated capacity. For HT consumers the same 50% limit applies to the 11 kV or 33 kV feeder's maximum permitted load, or to the substation capacity.
- The regulation has no net billing arrangement. TGERC's list of final regulations, checked on 18 November 2026, shows no later amendment of it.
Output and bill value for a rooftop plant in Telangana
Solar output changes across Telangana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,340 to 1,380 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Hyderabad | 1,380 | 1,400 |
| Karimnagar | 1,360 | 1,390 |
| Nizamabad | 1,370 | 1,400 |
| Ramagundam | 1,350 | 1,390 |
| Ramgundam | 1,350 | 1,380 |
| Secunderabad | 1,370 | 1,400 |
| Warangal | 1,340 | 1,370 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Questions about solar projects in Telangana
Is net metering available for factories and commercial buildings in Telangana?
In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Telangana
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com