Somaya Solar Solutions Limited delivers turnkey solar projects in Telangana: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Telangana
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Telangana
In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.
- The 2025 regulation repealed the earlier Regulation No. 6 of 2016 (net metering) and its amendments. Existing net metering users above 500 kWp keep net metering.
- Under net metering, if a consumer exports more than it imports in a billing period, the excess units are paid at the lowest tariff of the solar power purchase agreements the distribution companies signed in the previous financial year. They are adjusted in the next bill or paid into the consumer's bank account.
- A TGERC proceeding of 29 December 2025 sets this settlement rate at ₹2.57 per unit, from the date the regulation was notified until the Commission issues a new proceeding.
- Under gross metering, the distribution company buys all the solar energy at the same rate and bills the consumer separately for all its consumption.
- Group net metering is open only to domestic (LT-I) consumers and townships and residential colonies, below 100 kWp. Virtual net metering is open to all categories except temporary supply, below 100 kWp, for participating consumers of the same category in the same licensee's area.
- The total rooftop capacity on one distribution transformer may not exceed 50% of its rated capacity. For HT consumers the same 50% limit applies to the 11 kV or 33 kV feeder's maximum permitted load, or to the substation capacity.
- The regulation has no net billing arrangement. TGERC's list of final regulations, checked on 18 November 2026, shows no later amendment of it.
What to expect from the plant in Telangana
Solar output changes across Telangana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,340 to 1,380 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Hyderabad | 1,380 | 1,400 |
| Karimnagar | 1,360 | 1,390 |
| Nizamabad | 1,370 | 1,400 |
| Ramagundam | 1,350 | 1,390 |
| Ramgundam | 1,350 | 1,380 |
| Secunderabad | 1,370 | 1,400 |
| Warangal | 1,340 | 1,370 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Telangana
Is net metering available for factories and commercial buildings in Telangana?
In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Telangana
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.