Somaya Solar Solutions Limited builds ground-mounted solar power plants in Telangana for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Telangana
Solar output changes across Telangana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,370 to 1,400 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Hyderabad | 1,380 | 1,400 |
| Karimnagar | 1,360 | 1,390 |
| Nizamabad | 1,370 | 1,400 |
| Ramagundam | 1,350 | 1,390 |
| Ramgundam | 1,350 | 1,380 |
| Secunderabad | 1,370 | 1,400 |
| Warangal | 1,340 | 1,370 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Telangana
The Telangana Clean and Green Energy Policy, 2025 is the state's current policy for solar and other renewable projects. The Energy Department issued it on 11 January 2025, and it stays in operation for 10 years from that date.
- Target: an addition of 20,000 MW of renewable energy and storage capacity by 2030.
- TGGENCO and TGREDCO are the nodal agencies. They register projects and help with capacity allocation, land, power evacuation and clearances.
- Open access, banking and open access charges follow the TGERC open access regulation of 2024 and its amendments. Developers of solar plants for open access, captive or group-captive use register on the nodal agency's online portal.
- Solar projects get a 100% refund of stamp duty on land bought for the project. Micro, small and medium enterprises get a 100% exemption from electricity duty for 8 years from the commercial operation date, only for power consumed within the state.
- The policy's rooftop incentive (100% net SGST reimbursement) lists households, Indiramma houses, government schools and other government buildings. It does not list commercial or industrial rooftop plants.
Under TGERC's Terms and Conditions of Open Access Regulation, 2024 (Regulation No. 1 of 2024, gazetted 18 March 2024, amended on 24 January 2026), a consumer with a contracted demand or sanctioned load of 100 kW or more can take renewable power through green energy open access. For other open access, consumers above 1 MW are eligible, and the Commission will open it to 1 MW and below in phases.
- For green energy open access, the 100 kW can be one connection or several connections in the same electricity division of a distribution licensee. There is no limit on supply for captive consumers taking green energy open access.
- A captive user must consume at least 51% of the net electricity the plant generates in a year. No cross-subsidy surcharge is charged on power a captive user takes from its own captive plant for its own use.
- Banking is allowed each month. Banking charges are 8% of the banked energy, taken in kind. Unused banked energy lapses at the end of the calendar month.
- The additional surcharge for open access consumers is ₹0.13 per unit from 1 April to 30 September 2026. For 1 November 2026 to 31 March 2027 it is ₹0.82 per unit. Nothing is charged for October 2026.
- For green energy open access, the cross-subsidy surcharge cannot rise by more than 50% of the first year's rate in the 12 years from the date the renewable plant starts operating.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Telangana
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Telangana
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PVGIS, European Commission Joint Research Centre (solar output model)
- TGERC Terms and Conditions of Open Access Regulation, 2024 (Regulation No. 1 of 2024) and First Amendment Regulation, 2026 (24 January 2026); TGERC orders on additional surcharge for H1 (10 March 2026) and H2 (30 October 2026) of FY 2026-27
- Telangana Clean and Green Energy Policy, 2025, G.O.Ms.No.2 (Energy Department), dated 11 January 2025