Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Warangal, Telangana. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Warangal at a glance for solar projects
| District and state | Hanumakonda district, Telangana |
|---|---|
| Electricity supply | Northern Power Distribution Company of Telangana Limited (TGNPDCL) supplies electricity in Hanumakonda district, one of the districts it lists as its area. |
| Electricity regulator | Telangana Electricity Regulatory Commission (TGERC) |
| State renewable energy agency | Telangana Renewable Energy Development Corporation Limited (TGREDCO) |
| State solar policy | Telangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2 of 11 January 2025, in operation for 10 years) |
| Rooftop metering for businesses | Net metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers |
| Modelled solar output | about 1,340 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1200 km from Warangal in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Warangal
In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.
The size limits, charges and other conditions for Telangana are on the page Solar EPC Company in Telangana.
In Warangal the application for connection and metering goes to TGNPDCL.
What a plant produces in Warangal
A solar plant in Warangal is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry General, 11 kV energy charge of ₹7.65 per unit (TGERC Retail Supply Tariff Order for FY 2026-27, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹7.15 per unit at 33 kV and ₹6.65 at 132 kV and above. It is the same for TGSPDCL and TGNPDCL. A demand charge of ₹500 per kVA per month also applies. It is charged on the maximum demand recorded in the month or 80% of the contracted demand, whichever is higher. A minimum energy charge of 50 kVAh per kVA of billing demand per month applies. Time-of-day: plus ₹1.50 per unit from 6 am to 10 am and 6 pm to 10 pm, and less ₹0.50 per unit from 10 am to 6 pm. Fuel surcharge adjustment is extra, and the rates exclude electricity duty.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.65 per unit |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹10.3 lakh |
| 500 kW | 6.7 lakh units | 5,000 sq m | ₹51.3 lakh |
| 1 MW | 13.4 lakh units | 10,000 sq m | ₹1.03 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Warangal
The Government of India's One District One Product (ODOP) list names Granite Slabs as the product of Hanumakonda district.
EPC projects by Somaya Solar near Warangal
These are the Somaya Solar projects closest to Warangal, with straight-line distances. They are shown as references and are not in Warangal unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 650 km from Warangal. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1100 km from Warangal. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1220 km from Warangal. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Warangal
Which electricity company handles solar connections in Warangal?
Northern Power Distribution Company of Telangana Limited (TGNPDCL) supplies electricity in Hanumakonda district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Warangal?
Net metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers. The rule is the same across Telangana.
How much electricity does a solar plant generate in Warangal?
About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Warangal?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1200 km from Warangal in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 650 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Warangal
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PVGIS, European Commission Joint Research Centre (solar output model)
- TGERC (Rooftop Solar PV Grid Interactive Systems) Regulation, 2025 (Regulation No. 1 of 2025), Telangana Gazette of 15 November 2025; TGERC proceedings of 29 December 2025 on the settlement rate
- TGERC Retail Supply Tariff Order: FY 2026-27, Appendix A (Abstract of the Retail Supply Tariff for FY 2026-27), pages 289 to 294
- TGNPDCL website home page (meta description)
- Telangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2, Energy Department, 11 January 2025), section 5, which names TGGENCO and TGREDCO as nodal agencies; TGREDCO website
- Telangana Clean and Green Energy Policy, 2025, G.O.Ms.No.2 (Energy Department), dated 11 January 2025
- Telangana Electricity Regulatory Commission