Somaya Solar Solutions Limited delivers turnkey solar projects in Mapusa, Goa: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Mapusa

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (ED Goa) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Mapusa

In Goa, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.

The size limits, charges and other conditions for Goa are on the page Turnkey Solar EPC in Goa.

In Mapusa the application for connection and metering goes to ED Goa.

What to expect from the plant in Mapusa

A solar plant in Mapusa is modelled to produce about 1,330 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA) energy charge of ₹5.60 per kVAh (JERC Tariff Order of 30 September 2025 for the Electricity Department, Government of Goa (Petition No. 141/2025), in force from 1 October 2025, which sets tariffs for each year from 2025-26 to 2029-30. ₹5.60 is the energy charge it approves for 2026-27.). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹280 per kVA per month also applies, billed on the recorded maximum demand or 85% of the contract demand, whichever is higher. Time-of-day tariff is mandatory for HT consumers, except those with captive power plants or taking wheeled power: 0.8 times the energy charge from 09:00 to 17:00, 1.2 times from 17:00 to 01:00 and the normal charge from 01:00 to 09:00. Supply at 33 kV gets a 3% rebate on the energy charge. Electricity duty, taxes and any fuel and power purchase cost adjustment surcharge are extra. Industrial supply at 66 kV and above with contract demand over 5,000 kVA (EHTS-II) is ₹5.50 per kVAh with a fixed charge of ₹275 per kVA per month. A later JERC order of 6 May 2026 only trued up FY 2024-25 and did not change this tariff. The Electricity Department, Government of Goa is the licensee the order covers.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.60 per kVAh
100 kW1.3 lakh units1,000 sq m₹7.4 lakh
500 kW6.7 lakh units5,000 sq m₹37.2 lakh
1 MW13.3 lakh units10,000 sq m₹74.5 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Mapusa

These are the Somaya Solar projects closest to Mapusa, with straight-line distances. They are shown as references and are not in Mapusa unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1150 km from Mapusa. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1500 km from Mapusa. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1560 km from Mapusa. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Mapusa

Which electricity company handles solar connections in Mapusa?

Electricity Department, Government of Goa (ED Goa) supplies Mapusa, which the cited source places in its supply area.

Is net metering available for factories and commercial buildings in Mapusa?

Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Goa.

How much electricity does a solar plant generate in Mapusa?

About 1,330 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.3 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Mapusa?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1500 km from Mapusa in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1150 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Mapusa

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.