Somaya Solar Solutions Limited builds ground-mounted solar power plants in Naharlagun, Arunachal Pradesh for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Naharlagun
A solar plant in Naharlagun is modelled to produce about 1,190 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 11.9 lakh units | 4 to 5 acres |
| 2 MW | 23.8 lakh units | 8 to 10 acres |
| 5 MW | 59.5 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Arunachal Pradesh
Under APSERC's Green Energy Open Access Regulations, 2024, a consumer with a contracted demand (HT) or sanctioned load (LT) of 100 kW or more, other than a captive user, can take green power through open access. A captive consumer has no minimum load. The tariff order for 2026-27 sets the wheeling charge.
The charges, exemptions and conditions for Arunachal Pradesh are on the page Ground-Mounted Solar Plant in Arunachal Pradesh.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Naharlagun
These are the Somaya Solar projects closest to Naharlagun, with straight-line distances. They are shown as references and are not in Naharlagun unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1380 km from Naharlagun. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1510 km from Naharlagun. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Naharlagun
Which electricity company handles solar connections in Naharlagun?
Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Papum Pare district.
How much electricity does a solar plant generate in Naharlagun?
About 1,190 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.9 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Naharlagun?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1600 km from Naharlagun in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1380 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Naharlagun
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APSERC order on Petition TP-10 of 2025 (31 March 2026), para 1.4
- APSERC order on Petition TP-10 of 2025, issued 31 March 2026 (Table 81 and paragraph 6.6); APSERC Green Energy Open Access (GEOA) and Methodology for calculation of Charges Regulations, 2024