Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Namsai, Arunachal Pradesh. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Namsai

The Government of India's One District One Product (ODOP) list names Khampti Rice (Khau Tai) as the product of Namsai district.

Metering rules for business rooftops in Namsai

In Arunachal Pradesh, grid-connected distributed renewable systems fall under the APERC (Grid Interactive Distributed Renewable Energy System with Net Metering including Group Net Metering and Virtual Net Metering, Net Billing/Net Feed-In, Gross Metering and Its Related Matters) Regulations, 2024, notified on 4 March 2024 and published in the Gazette on 11 March 2024. They replaced the 2016 rooftop regulations.

The size limits, charges and other conditions for Arunachal Pradesh are on the page Commercial & Industrial Solar in Arunachal Pradesh.

In Namsai the application for connection and metering goes to APDOP.

Output and bill value for a rooftop plant in Namsai

A solar plant in Namsai is modelled to produce about 1,110 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, HT, three-phase 11 kV energy charge of ₹4.50 per kWh (APSERC order on Petition TP-10 of 2025, issued 31 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹4.15 per kWh at 33 kV and ₹4.00 at 132 kV, and ₹4.95 on LT. The schedule shows an energy rate only and says a consumer does not pay a minimum charge. Time-of-day billing starts for consumers with maximum demand above 10 kW after smart meters are installed: solar hours from 8 AM to 4 PM at 20% below the normal energy rate and 5 PM to 9 PM at 1.2 times the normal rate. The Commission records that every consumer category is subsidised by the state government. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.50 per kWh
100 kW1.1 lakh units1,000 sq m₹5.0 lakh
250 kW2.8 lakh units2,500 sq m₹12.5 lakh
500 kW5.5 lakh units5,000 sq m₹25.0 lakh
1 MW11.1 lakh units10,000 sq m₹50.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Namsai

These are the Somaya Solar projects closest to Namsai, with straight-line distances. They are shown as references and are not in Namsai unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1570 km from Namsai. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1660 km from Namsai. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1740 km from Namsai. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Namsai

Which electricity company handles solar connections in Namsai?

Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Namsai district.

Is net metering available for factories and commercial buildings in Namsai?

Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW. The rule is the same across Arunachal Pradesh.

How much electricity does a solar plant generate in Namsai?

About 1,110 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Namsai?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1810 km from Namsai in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1570 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Namsai

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.