Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Padra, Gujarat. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Padra

The Government of India's One District One Product (ODOP) list names Pharmaceuticals and Engineering Products as the products of Vadodara district.

Metering rules for business rooftops in Padra

Since 30 October 2026, new rooftop and other distributed renewable systems in Gujarat come under GERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2026. They replace the Net Metering Rooftop Solar PV Regulations, 2016, last amended by the fifth amendment of 3 November 2025. Every consumer category may choose net metering, net billing, gross metering, group net metering or virtual net metering. Systems installed under the 2016 regulations stay under those rules and their agreements.

The size limits, charges and other conditions for Gujarat are on the page Commercial & Industrial Solar in Gujarat.

In Padra the application for connection and metering goes to MGVCL.

Output and bill value for a rooftop plant in Padra

A solar plant in Padra is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HTP-I (HT supply, contract demand 100 kVA and above), billing demand above 500 kVA and up to 2,500 kVA energy charge of ₹4.20 per kWh (GERC tariff orders for DGVCL, MGVCL, PGVCL and UGVCL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule applies to all four state companies. The energy charge is ₹4.00 per kWh up to 500 kVA of billing demand and ₹4.30 above 2,500 kVA. A demand charge also applies each month: ₹150 per kVA for the first 500 kVA, ₹260 for the next 500 kVA and ₹475 above 1,000 kVA, on the higher of actual maximum demand, 85% of contract demand or 100 kVA. Energy used from 7 to 11 AM and 6 to 10 PM costs 45 paise per kWh more (85 paise above 500 kVA), and energy used from 11 AM to 5 PM gets 60 paise per kWh off. A fuel and power purchase adjustment surcharge (FPPAS) is added by a GERC formula, and electricity duty and taxes are extra. Torrent Power has its own schedules: HTMD-1 in Ahmedabad and Gandhinagar is 455 paise per kWh for the first 400 units per kW of billing demand and 445 paise after that; HTMD-I in Surat is 480 and 470 paise; HTP-I in Dahej SEZ and Dholera SIR is 290 to 320 paise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.20 per kWh
100 kW1.4 lakh units1,000 sq m₹5.8 lakh
250 kW3.5 lakh units2,500 sq m₹14.6 lakh
500 kW7.0 lakh units5,000 sq m₹29.2 lakh
1 MW13.9 lakh units10,000 sq m₹58.4 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Padra

These are the Somaya Solar projects closest to Padra, with straight-line distances. They are shown as references and are not in Padra unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 930 km from Padra. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 970 km from Padra. Completed in two months, with five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 990 km from Padra. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.

See all published projects

Questions about solar projects in Padra

Which electricity company handles solar connections in Padra?

Madhya Gujarat Vij Company Limited (MGVCL) supplies electricity in Vadodara district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Padra?

Net metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC). The rule is the same across Gujarat.

How much electricity does a solar plant generate in Padra?

About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Padra?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 840 km from Padra in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 930 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Padra

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image