Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Palitana, Gujarat. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Palitana
The Government of India's One District One Product (ODOP) list names Dehydrated Vegetables (Onion), Beadwork and Peanut butter as the products of Bhavnagar district.
Metering rules for business rooftops in Palitana
Since 30 October 2026, new rooftop and other distributed renewable systems in Gujarat come under GERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2026. They replace the Net Metering Rooftop Solar PV Regulations, 2016, last amended by the fifth amendment of 3 November 2025. Every consumer category may choose net metering, net billing, gross metering, group net metering or virtual net metering. Systems installed under the 2016 regulations stay under those rules and their agreements.
The size limits, charges and other conditions for Gujarat are on the page Commercial & Industrial Solar in Gujarat.
In Palitana the application for connection and metering goes to PGVCL.
Output and bill value for a rooftop plant in Palitana
A solar plant in Palitana is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HTP-I (HT supply, contract demand 100 kVA and above), billing demand above 500 kVA and up to 2,500 kVA energy charge of ₹4.20 per kWh (GERC tariff orders for DGVCL, MGVCL, PGVCL and UGVCL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule applies to all four state companies. The energy charge is ₹4.00 per kWh up to 500 kVA of billing demand and ₹4.30 above 2,500 kVA. A demand charge also applies each month: ₹150 per kVA for the first 500 kVA, ₹260 for the next 500 kVA and ₹475 above 1,000 kVA, on the higher of actual maximum demand, 85% of contract demand or 100 kVA. Energy used from 7 to 11 AM and 6 to 10 PM costs 45 paise per kWh more (85 paise above 500 kVA), and energy used from 11 AM to 5 PM gets 60 paise per kWh off. A fuel and power purchase adjustment surcharge (FPPAS) is added by a GERC formula, and electricity duty and taxes are extra. Torrent Power has its own schedules: HTMD-1 in Ahmedabad and Gandhinagar is 455 paise per kWh for the first 400 units per kW of billing demand and 445 paise after that; HTMD-I in Surat is 480 and 470 paise; HTP-I in Dahej SEZ and Dholera SIR is 290 to 320 paise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹4.20 per kWh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹5.9 lakh |
| 250 kW | 3.5 lakh units | 2,500 sq m | ₹14.8 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹29.6 lakh |
| 1 MW | 14.1 lakh units | 10,000 sq m | ₹59.2 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Palitana
These are the Somaya Solar projects closest to Palitana, with straight-line distances. They are shown as references and are not in Palitana unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1080 km from Palitana. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1110 km from Palitana. Completed in two months, with five years of operation and maintenance.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1130 km from Palitana. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
Questions about solar projects in Palitana
Which electricity company handles solar connections in Palitana?
Paschim Gujarat Vij Company Limited (PGVCL) supplies Palitana, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Palitana?
Net metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC). The rule is the same across Gujarat.
How much electricity does a solar plant generate in Palitana?
About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Palitana?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 970 km from Palitana in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1080 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Palitana
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 (Notification No. 11 of 2026, Gujarat Government Gazette of 30 October 2026) and Statement of Reasons; GERC Green Energy Open Access (Sixth Amendment) Regulations, 2026, notified 19 August 2026
- GERC tariff schedule of the four state-owned distribution companies, effective 1 April 2026 (Part II, rate HTP-I); GERC tariff schedules of TPL-D (A), TPL-D (S) and TPL-D (Dahej), effective 1 April 2026
- GeoNames (place coordinates, CC BY 4.0)
- PGVCL: source naming Palitana within its supply area
- PVGIS, European Commission Joint Research Centre (solar output model)