Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Rajaldesar, Rajasthan. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Rajaldesar at a glance for solar projects
| District and state | Churu district, Rajasthan |
|---|---|
| Electricity supply | Jodhpur Vidyut Vitran Nigam Limited (JdVVNL) supplies electricity in Churu district, one of the districts it lists as its area. |
| Electricity regulator | Rajasthan Electricity Regulatory Commission (RERC) |
| State renewable energy agency | Rajasthan Renewable Energy Corporation Limited (RREC) |
| State solar policy | Rajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
| Modelled solar output | about 1,500 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 300 km from Rajaldesar in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Rajaldesar
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
The size limits, charges and other conditions for Rajasthan are on the page Solar EPC Company in Rajasthan.
In Rajaldesar the application for connection and metering goes to JdVVNL.
What a plant produces in Rajaldesar
A solar plant in Rajaldesar is modelled to produce about 1,500 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.50 per unit |
|---|---|---|---|
| 100 kW | 1.5 lakh units | 1,000 sq m | ₹9.8 lakh |
| 500 kW | 7.5 lakh units | 5,000 sq m | ₹48.8 lakh |
| 1 MW | 15.0 lakh units | 10,000 sq m | ₹97.5 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Rajaldesar
The Government of India's One District One Product (ODOP) list names Wood Products as the product of Churu district.
EPC projects by Somaya Solar near Rajaldesar
These are the Somaya Solar projects closest to Rajaldesar, with straight-line distances. They are shown as references and are not in Rajaldesar unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 400 km from Rajaldesar. In progress. Site access was difficult and was handled with local support.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 410 km from Rajaldesar. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 420 km from Rajaldesar. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Rajaldesar
Which electricity company handles solar connections in Rajaldesar?
Jodhpur Vidyut Vitran Nigam Limited (JdVVNL) supplies electricity in Churu district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Rajaldesar?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.
How much electricity does a solar plant generate in Rajaldesar?
About 1,500 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.0 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Rajaldesar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 300 km from Rajaldesar in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 400 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Rajaldesar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- JdVVNL website (energy.rajasthan.gov.in/jdvvnl), About Department text
- Ministry of Housing and Urban Affairs, PMAY-Urban: "List of ULB" (columns: state, district code, district, city code, city, ULB type; undated; district names are those of 2023-24, before the 28 December 2024 dissolutions)
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- RERC tariff order for 2026-27, dated 30 March 2026
- Rajasthan Electricity Regulatory Commission
- Rajasthan Integrated Clean Energy Policy, 2024 (Energy Department, Government of Rajasthan)