Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Ramganj Mandi, Rajasthan. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Ramganj Mandi at a glance for solar projects
| District and state | Kota district, Rajasthan |
|---|---|
| Electricity supply | Jaipur Vidyut Vitran Nigam Limited (JVVNL) supplies electricity in Kota district, one of the districts it lists as its area. |
| Electricity regulator | Rajasthan Electricity Regulatory Commission (RERC) |
| State renewable energy agency | Rajasthan Renewable Energy Corporation Limited (RREC) |
| State solar policy | Rajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
| Modelled solar output | about 1,410 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 470 km from Ramganj Mandi in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Ramganj Mandi
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
The size limits, charges and other conditions for Rajasthan are on the page Solar EPC Company in Rajasthan.
In Ramganj Mandi the application for connection and metering goes to JVVNL.
What a plant produces in Ramganj Mandi
A solar plant in Ramganj Mandi is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.50 per unit |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.2 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹45.8 lakh |
| 1 MW | 14.1 lakh units | 10,000 sq m | ₹91.7 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Ramganj Mandi: industrial areas
RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Ramganj Mandi among its industrial areas in Kota district.
The Government of India's One District One Product (ODOP) list names Kota Doria as the product of Kota district.
EPC projects by Somaya Solar near Ramganj Mandi
These are the Somaya Solar projects closest to Ramganj Mandi, with straight-line distances. They are shown as references and are not in Ramganj Mandi unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 460 km from Ramganj Mandi. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 530 km from Ramganj Mandi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 540 km from Ramganj Mandi. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Ramganj Mandi
Which electricity company handles solar connections in Ramganj Mandi?
Jaipur Vidyut Vitran Nigam Limited (JVVNL) supplies electricity in Kota district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Ramganj Mandi?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.
How much electricity does a solar plant generate in Ramganj Mandi?
About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Ramganj Mandi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 470 km from Ramganj Mandi in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 460 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Ramganj Mandi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- JVVNL website (energy.rajasthan.gov.in/jvvnl), About Us > About Department
- Ministry of Housing and Urban Affairs, PMAY-Urban: "List of ULB" (columns: state, district code, district, city code, city, ULB type; undated; district names are those of 2023-24, before the 28 December 2024 dissolutions)
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- RERC tariff order for 2026-27, dated 30 March 2026
- RIICO: Land Availability, item 6 "Layout Plan of Industrial Areas (updated on 03.09.2026)", listed by RIICO unit office
- Rajasthan Electricity Regulatory Commission
- Rajasthan Integrated Clean Energy Policy, 2024 (Energy Department, Government of Rajasthan)