Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Revelganj, Bihar as an EPC contractor: engineering, supply, construction and commissioning.
What Bihar's policy says about large solar plants
The Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025 is the state's current policy for solar and other renewable projects. The Energy Department, Government of Bihar issued it on 10 July 2025. It stays in force for five years or until a new policy replaces it. Projects commissioned in that time get the incentives for up to 25 years from commissioning.
Under BERC's Green Energy Open Access Regulations, 2024, a consumer with a contract demand or sanctioned load of 100 kW or more (on one connection or several in the same electricity division) can take renewable power through open access. The regulations came into force when they were published in the Bihar Gazette on 23 December 2024.
The charges, exemptions and conditions for Bihar are on the page Utility-Scale Solar in Bihar.
Output and land at megawatt scale in Revelganj
A solar plant in Revelganj is modelled to produce about 1,430 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (30°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 71.5 lakh units | 20 to 25 acres |
| 10 MW | 1.43 crore units | 40 to 50 acres |
| 25 MW | 3.58 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Revelganj
These are the Somaya Solar projects closest to Revelganj, with straight-line distances. They are shown as references and are not in Revelganj unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 480 km from Revelganj. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 700 km from Revelganj. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Revelganj
Which electricity company handles solar connections in Revelganj?
North Bihar Power Distribution Company Limited (NBPDCL) supplies electricity in Saran district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Revelganj?
About 1,430 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.3 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Revelganj?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 780 km from Revelganj in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 480 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Revelganj
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BERC (Green Energy Open Access) Regulations, 2024, notified 9 December 2024, Bihar Gazette (Extra) 23 December 2024; BERC tariff order for NBPDCL and SBPDCL for 2026-27, dated 18 March 2026 (chapters 8 and 9)
- Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025, Energy Department, Government of Bihar (scanned PDF); MNRE Policy & Regulatory Updates, July 2025, item V.1, gives the date 10 July 2025
- GeoNames (place coordinates, CC BY 4.0)
- NBPDCL website, About Us > Organization
- PVGIS, European Commission Joint Research Centre (solar output model)