Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Sadri, Rajasthan. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Sadri at a glance for solar projects

District and statePali district, Rajasthan
Electricity supplyJodhpur Vidyut Vitran Nigam Limited (JdVVNL) supplies electricity in Pali district, one of the districts it lists as its area.
Electricity regulatorRajasthan Electricity Regulatory Commission (RERC)
State renewable energy agencyRajasthan Renewable Energy Corporation Limited (RREC)
State solar policyRajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,450 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 550 km from Sadri in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Sadri

In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.

The size limits, charges and other conditions for Rajasthan are on the page Solar EPC Company in Rajasthan.

In Sadri the application for connection and metering goes to JdVVNL.

What a plant produces in Sadri

A solar plant in Sadri is modelled to produce about 1,450 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.4 lakh units1,000 sq m₹9.4 lakh
500 kW7.2 lakh units5,000 sq m₹47.1 lakh
1 MW14.5 lakh units10,000 sq m₹94.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Local points for solar projects in Sadri

The Government of India's One District One Product (ODOP) list names Textile Products as the product of Pali district.

EPC projects by Somaya Solar near Sadri

These are the Somaya Solar projects closest to Sadri, with straight-line distances. They are shown as references and are not in Sadri unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 650 km from Sadri. In progress. Site access was difficult and was handled with local support.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 700 km from Sadri. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 700 km from Sadri. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Sadri

Which electricity company handles solar connections in Sadri?

Jodhpur Vidyut Vitran Nigam Limited (JdVVNL) supplies electricity in Pali district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Sadri?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Sadri?

About 1,450 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.5 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Sadri?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 550 km from Sadri in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 650 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Sadri

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image