Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Saiha, Mizoram. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Saiha

The Government of India's One District One Product (ODOP) list names Mizo Chilli as the product of Siaha district.

Metering rules for business rooftops in Saiha

In Mizoram, rooftop solar falls under the JERC for Manipur and Mizoram (Metering for Grid Connected Renewable Energy) Regulations, 2016, as amended in 2016, 2022 and twice in 2023. MZERC adopted them on 26 July 2024, from 23 July 2024, and the 2026 MZERC orders still apply them.

The size limits, charges and other conditions for Mizoram are on the page Commercial & Industrial Solar in Mizoram.

In Saiha the application for connection and metering goes to P&ED.

Output and bill value for a rooftop plant in Saiha

A solar plant in Saiha is modelled to produce about 1,290 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Industrial Service (HT Industrial), Option-1 energy charge of ₹9.05 per kVAh (MZERC tariff order for P&ED Mizoram for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹80 per kVA of billing demand per month also applies. Option-2 time-of-day rates per kVAh: ₹9.05 from 6 AM to 5 PM, ₹11.40 from 5 to 10 PM and ₹7.05 from 10 PM to 6 AM; it starts only when P&ED has the metering and billing system ready. These are the subsidised rates. If the state government's monthly subsidy is not paid in advance, P&ED may bill the full cost tariff, which is ₹9.68 per kVAh for HT Industrial Option-1. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹9.05 per kVAh
100 kW1.3 lakh units1,000 sq m₹11.7 lakh
250 kW3.2 lakh units2,500 sq m₹29.2 lakh
500 kW6.5 lakh units5,000 sq m₹58.4 lakh
1 MW12.9 lakh units10,000 sq m₹1.17 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Saiha

These are the Somaya Solar projects closest to Saiha, with straight-line distances. They are shown as references and are not in Saiha unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1440 km from Saiha. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1590 km from Saiha. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1690 km from Saiha. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Saiha

Which electricity company handles solar connections in Saiha?

Power & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Siaha district.

Is net metering available for factories and commercial buildings in Saiha?

Net metering up to 10 kW; gross metering above that, up to 1 MWp. The rule is the same across Mizoram.

How much electricity does a solar plant generate in Saiha?

About 1,290 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Saiha?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1700 km from Saiha in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1440 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Saiha

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image