Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Shimla, Himachal Pradesh.

Shimla at a glance for solar projects

District and stateShimla district, Himachal Pradesh
Electricity supplyHimachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Shimla district.
Electricity regulatorHimachal Pradesh Electricity Regulatory Commission (HPERC)
State renewable energy agencyHimachal Pradesh Energy Development Agency (HIMURJA)
State solar policySwaran Jayanti Energy Policy, 2021 (notified on 20 January 2022, as amended)
Rooftop metering for businessesNet metering up to 50 kWp; net billing above 50 kWp up to 1 MWp
Modelled solar outputabout 1,350 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 270 km from Shimla in a straight line

Solar services in Shimla

Local points for solar projects in Shimla

The Government of India's One District One Product (ODOP) list names Tourism as the product of Shimla district.

Solar output in Shimla

A solar plant in Shimla is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial Power Supply (LIPS), HT-1, contract demand above 100 kVA and up to 1 MVA energy charge of ₹5.85 per kVAh (HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹5.60 per kVAh for HT-2 (contract demand above 1 MVA), ₹5.55 at 66 kV, ₹5.50 at 132 kV and ₹5.45 at 220 kV and above. A demand charge also applies each month: ₹250 per kVA for HT-1, ₹400 per kVA for HT-2 and ₹425 per kVA for EHT. It is charged on the recorded maximum demand or 85% of the contract demand, whichever is higher. Energy used in peak hours (6:30 PM to 10 PM) is charged at ₹6.95 per kVAh for HT and ₹6.75 for EHT. The rates exclude electricity duty and taxes. HPSEBL is the only licensee, so the schedule applies across the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.85 per kVAh
100 kW1.4 lakh units1,000 sq m₹7.9 lakh
500 kW6.8 lakh units5,000 sq m₹39.5 lakh
1 MW13.5 lakh units10,000 sq m₹79.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Shimla

For a rooftop array in Shimla the strongest month is May, at about 144 units for each kW installed, and the weakest is January, at about 94. For a ground-mounted array at a 33° tilt the strongest month is March (about 139) and the weakest is July (about 88). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January94119
February101119
March129139
April140138
May144133
June129115
July9788
August9491
September107111
October118137
November100127
December94124

Somaya Solar projects near Shimla

These are the Somaya Solar projects closest to Shimla, with straight-line distances. They are shown as references and are not in Shimla unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 150 km from Shimla. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 160 km from Shimla. Included net-metering coordination with the local electricity distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 270 km from Shimla. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Shimla

Which electricity company handles solar connections in Shimla?

Himachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Shimla district.

Is net metering available for factories and commercial buildings in Shimla?

Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp. The rule is the same across Himachal Pradesh.

How much electricity does a solar plant generate in Shimla?

About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Shimla?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 270 km from Shimla in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 150 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Shimla

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image