Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Shivamogga, Karnataka. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Shivamogga
The Government of India's One District One Product (ODOP) list names BioPharma and Wellness and Wooden Carving as the products of Shivamogga district.
Metering rules for business rooftops in Shivamogga
In Karnataka, net metering is open to every consumer category, including commercial and industrial. The plant may be up to the sanctioned load or contract demand, or 1,000 kW, whichever is lower. The Distributed Solar PV (DSPV) Plants Regulations, 2026 set this. They were notified on 19 August 2026, published in the gazette on 24 August 2026, and replaced the 2016 rooftop regulations.
The size limits, charges and other conditions for Karnataka are on the page Commercial & Industrial Solar in Karnataka.
In Shivamogga the application for connection and metering goes to MESCOM.
Output and bill value for a rooftop plant in Shivamogga
A solar plant in Shivamogga is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-2(a) Industrial, rate the Tariff Order 2025 fixes for FY2026-27 energy charge of ₹6.60 per kWh (KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025 (FY2025-26 to FY2027-28), and KERC review order of 3 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Tariff Order 2025 fixes the HT-2(a) energy charge for FY2026-27 at 660 paise per kWh, with a demand charge of ₹350 per kVA per month. KERC's review order of 3 March 2026 re-fixed HT-2(a) for FY2025-26 at ₹6.70 per unit and ₹365 per kVA. It does not say what applies for FY2026-27; the table uses the ₹6.60 the Tariff Order 2025 fixes for that year. The same HT-2(a) schedule applies to all five distribution companies. A time-of-day tariff applies (plus 100 paise at 06:00-09:00 and 18:00-22:00 and minus 100 paise at 22:00-06:00, December to June). BESCOM consumers also pay an FY25 true-up charge per unit from May 2026 to April 2027. Confirm the rate with the distribution company.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.60 per kWh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.9 lakh |
| 250 kW | 3.4 lakh units | 2,500 sq m | ₹22.3 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹44.5 lakh |
| 1 MW | 13.5 lakh units | 10,000 sq m | ₹89.1 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Shivamogga
These are the Somaya Solar projects closest to Shivamogga, with straight-line distances. They are shown as references and are not in Shivamogga unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1610 km from Shivamogga. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1730 km from Shivamogga. Completed in two months, with five years of operation and maintenance.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1800 km from Shivamogga. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
Questions about solar projects in Shivamogga
Which electricity company handles solar connections in Shivamogga?
Mangalore Electricity Supply Company Limited (MESCOM) supplies electricity in Shivamogga district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Shivamogga?
Net metering up to the sanctioned load or 1,000 kW, whichever is lower. The rule is the same across Karnataka.
How much electricity does a solar plant generate in Shivamogga?
About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Shivamogga?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1650 km from Shivamogga in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1610 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Shivamogga
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026 (notification of 19 August 2026) and KERC generic tariff order of 25 August 2026
- KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025
- MESCOM website, About Us
- PVGIS, European Commission Joint Research Centre (solar output model)