Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Shivamogga, Karnataka. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Shivamogga at a glance for solar projects
| District and state | Shivamogga district, Karnataka |
|---|---|
| Electricity supply | Mangalore Electricity Supply Company Limited (MESCOM) supplies electricity in Shivamogga district, one of the districts it lists as its area. |
| Electricity regulator | Karnataka Electricity Regulatory Commission (KERC) |
| State renewable energy agency | Karnataka Renewable Energy Development Limited (KREDL) |
| State solar policy | Karnataka Renewable Energy Policy 2022-2027 (valid five years from gazette issue on 6 May 2022, or until a new policy is announced) |
| Rooftop metering for businesses | Net metering up to the sanctioned load or 1,000 kW, whichever is lower |
| Modelled solar output | about 1,350 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1650 km from Shivamogga in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Shivamogga
In Karnataka, net metering is open to every consumer category, including commercial and industrial. The plant may be up to the sanctioned load or contract demand, or 1,000 kW, whichever is lower. The Distributed Solar PV (DSPV) Plants Regulations, 2026 set this. They were notified on 19 August 2026, published in the gazette on 24 August 2026, and replaced the 2016 rooftop regulations.
The size limits, charges and other conditions for Karnataka are on the page Solar EPC Company in Karnataka.
In Shivamogga the application for connection and metering goes to MESCOM.
What a plant produces in Shivamogga
A solar plant in Shivamogga is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-2(a) Industrial, rate the Tariff Order 2025 fixes for FY2026-27 energy charge of ₹6.60 per kWh (KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025 (FY2025-26 to FY2027-28), and KERC review order of 3 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Tariff Order 2025 fixes the HT-2(a) energy charge for FY2026-27 at 660 paise per kWh, with a demand charge of ₹350 per kVA per month. KERC's review order of 3 March 2026 re-fixed HT-2(a) for FY2025-26 at ₹6.70 per unit and ₹365 per kVA. It does not say what applies for FY2026-27; the table uses the ₹6.60 the Tariff Order 2025 fixes for that year. The same HT-2(a) schedule applies to all five distribution companies. A time-of-day tariff applies (plus 100 paise at 06:00-09:00 and 18:00-22:00 and minus 100 paise at 22:00-06:00, December to June). BESCOM consumers also pay an FY25 true-up charge per unit from May 2026 to April 2027. Confirm the rate with the distribution company.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.60 per kWh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.9 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹44.5 lakh |
| 1 MW | 13.5 lakh units | 10,000 sq m | ₹89.1 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Shivamogga
The Government of India's One District One Product (ODOP) list names BioPharma and Wellness and Wooden Carving as the products of Shivamogga district.
EPC projects by Somaya Solar near Shivamogga
These are the Somaya Solar projects closest to Shivamogga, with straight-line distances. They are shown as references and are not in Shivamogga unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1210 km from Shivamogga. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1610 km from Shivamogga. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1690 km from Shivamogga. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Shivamogga
Which electricity company handles solar connections in Shivamogga?
Mangalore Electricity Supply Company Limited (MESCOM) supplies electricity in Shivamogga district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Shivamogga?
Net metering up to the sanctioned load or 1,000 kW, whichever is lower. The rule is the same across Karnataka.
How much electricity does a solar plant generate in Shivamogga?
About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Shivamogga?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1650 km from Shivamogga in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1210 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Shivamogga
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026 (notification of 19 August 2026) and KERC generic tariff order of 25 August 2026
- KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025
- Karnataka Electricity Regulatory Commission
- Karnataka Renewable Energy Policy 2022-2027, Energy Department notification of 16 April 2022 (Karnataka Gazette, 6 May 2022)
- MESCOM website, About Us
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type