Solar EPC Company in Sikandrabad

Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Sikandrabad, Uttar Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Sikandrabad at a glance for solar projects

District and stateBulandshahr district, Uttar Pradesh
Electricity supplyPashchimanchal Vidyut Vitran Nigam Limited (PVVNL), the state distribution company with its head office in Meerut, supplies electricity in Bulandshahr district, one of the 14 districts it lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,420 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 30 km from Sikandrabad in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Sikandrabad

In Uttar Pradesh, commercial and industrial consumers do not get net metering. Under the regulator's rooftop solar regulations of 2019, as amended, they can use net billing (also called net feed-in) or gross metering. Net metering is kept for domestic and metered agricultural consumers and, since November 2023, for public and educational institutions.

The size limits, charges and other conditions for Uttar Pradesh are on the page Solar EPC Company in Uttar Pradesh.

In Sikandrabad the application for connection and metering goes to PVVNL.

What a plant produces in Sikandrabad

A solar plant in Sikandrabad is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹10.1 lakh
500 kW7.1 lakh units5,000 sq m₹50.4 lakh
1 MW14.2 lakh units10,000 sq m₹1.01 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Sikandrabad and the National Capital Region

Bulandshahr district is one of the eight Uttar Pradesh districts in the National Capital Region, by the list of the NCR Planning Board.

The Graded Response Action Plan for air quality covers the whole National Capital Region. From Stage I, diesel generator sets are not to be used as a regular source of power, and from Stage II their running is regulated across industrial, commercial and residential users. Solar does not replace backup power on its own, but it cuts the daytime energy a unit has to draw from the grid.

Under the state's One District One Product scheme, the product listed for Bulandshahr district is Ceramic Products.

The Government of India's One District One Product (ODOP) list names Ceramic Products as the product of Bulandshahr district.

EPC projects by Somaya Solar near Sikandrabad

These are the Somaya Solar projects closest to Sikandrabad, with straight-line distances. They are shown as references and are not in Sikandrabad unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 90 km from Sikandrabad. In progress. Site access was difficult and was handled with local support.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 150 km from Sikandrabad. Completed in two months, with five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 170 km from Sikandrabad. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.

See all published projects

Questions about solar projects in Sikandrabad

Which electricity company handles solar connections in Sikandrabad?

Pashchimanchal Vidyut Vitran Nigam Limited (PVVNL), the state distribution company with its head office in Meerut, supplies electricity in Bulandshahr district, one of the 14 districts it lists as its area.

Is net metering available for factories and commercial buildings in Sikandrabad?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Sikandrabad?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Sikandrabad?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 30 km from Sikandrabad in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 90 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Sikandrabad

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image