Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Sitarganj, Uttarakhand. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Sitarganj: industrial areas
SIIDCUL, the State Infrastructure and Industrial Development Corporation of Uttarakhand, lists IIE Sitarganj Phase II among its industrial areas in Udham Singh Nagar district.
The Government of India's One District One Product (ODOP) list names Moonj Grass product as the product of Udham Singh Nagar district.
Metering rules for business rooftops in Sitarganj
In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.
The size limits, charges and other conditions for Uttarakhand are on the page Commercial & Industrial Solar in Uttarakhand.
In Sitarganj the application for connection and metering goes to UPCL.
Output and bill value for a rooftop plant in Sitarganj
A solar plant in Sitarganj is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.4 lakh |
| 250 kW | 3.4 lakh units | 2,500 sq m | ₹23.5 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹46.9 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹93.8 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Sitarganj
These are the Somaya Solar projects closest to Sitarganj, with straight-line distances. They are shown as references and are not in Sitarganj unless the line says so.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 80 km from Sitarganj. Completed in two months, with five years of operation and maintenance.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 120 km from Sitarganj. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 190 km from Sitarganj. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Sitarganj
Which electricity company handles solar connections in Sitarganj?
Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Udham Singh Nagar district.
Is net metering available for factories and commercial buildings in Sitarganj?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.
How much electricity does a solar plant generate in Sitarganj?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Sitarganj?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 220 km from Sitarganj in a straight line. The closest published project is Naini Papers Limited (3 MW rooftop plant) in Kashipur, about 80 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Sitarganj
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- SIIDCUL website home page, menu "Parks" (IIEs and SIDCs)
- UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023, with the First Amendment of 20 June 2024 and the Second Amendment of 27 November 2025, and UERC generic tariff order of 4 June 2026
- UERC tariff order for UPCL for 2026-27, dated 30 March 2026 (Annexure 1, Rate Schedule RTS-5)
- UERC tariff order for UPCL, 2026-27 (30 March 2026), section 6.1