Somaya Solar Solutions Limited delivers turnkey solar projects in Srinagar, Uttarakhand: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Srinagar

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (UPCL) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Srinagar

In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.

The size limits, charges and other conditions for Uttarakhand are on the page Turnkey Solar EPC in Uttarakhand.

In Srinagar the application for connection and metering goes to UPCL.

What to expect from the plant in Srinagar

A solar plant in Srinagar is modelled to produce about 1,300 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.85 per kVAh
100 kW1.3 lakh units1,000 sq m₹8.9 lakh
500 kW6.5 lakh units5,000 sq m₹44.5 lakh
1 MW13.0 lakh units10,000 sq m₹89.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Srinagar

These are the Somaya Solar projects closest to Srinagar, with straight-line distances. They are shown as references and are not in Srinagar unless the line says so.

  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 70 km from Srinagar. Included net-metering coordination with the local electricity distribution company.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 80 km from Srinagar. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 110 km from Srinagar. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Srinagar

Which electricity company handles solar connections in Srinagar?

Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Pauri Garhwal district.

Is net metering available for factories and commercial buildings in Srinagar?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.

How much electricity does a solar plant generate in Srinagar?

About 1,300 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.0 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Srinagar?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 220 km from Srinagar in a straight line. The closest published project is Luminous (1 MW rooftop plant) in Haridwar, about 70 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Srinagar

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image