Somaya Solar Solutions Limited delivers turnkey solar projects in Jammu and Kashmir: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Jammu and Kashmir

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Jammu and Kashmir

In Jammu and Kashmir, eligible consumers of all categories, commercial and industrial included, can set up a renewable energy system under net metering up to 500 kW. Net billing covers systems above 500 kW and up to 1 MW. The rules are in JERC's Grid Interactive Renewable Energy System regulations, 2023 (notified on 29 May 2023). They were amended once, on 28 June 2024.

  • Gross metering is also allowed up to 1 MW. A consumer may use only one of the three arrangements in the same premises.
  • The plant may not be larger than the sanctioned load (kW) or the contract demand (kVA). The licensee may consider a net metering plant above 500 kW if its network stays stable.
  • A plant above 1 MW under net billing or gross metering needs load flow studies that show no adverse effect on the grid.
  • The total capacity under net metering and net billing connected to one distribution transformer or feeder may go up to 100% of its rated capacity.
  • Group net metering is open to all consumers for systems of 5 kW to 500 kW. Virtual net metering is only for residential consumers, group housing societies and government or local authority establishments.
  • Under net metering, surplus units carry forward as credit. Credit left at the end of the financial year is bought by the licensee at the lower of its average power purchase cost and the feed-in tariff, and paid by 31 May of the next year.
  • Under net billing, the surplus is sold to the licensee at the feed-in tariff approved by the Commission. Imports are charged under the tariff order.
  • Consumers with arrears are not eligible.
  • The First Amendment of 28 June 2024 changed the process. Complete applications up to 10 kW are deemed accepted without a feasibility study. For systems above 10 kW the licensee has 15 days for the study, or the proposal is presumed feasible. After the installation certificate the licensee has 15 days to sign the agreement, fit the meter and commission.

What to expect from the plant in Jammu and Kashmir

Solar output changes across Jammu and Kashmir with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,320 to 1,480 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Akhnur1,3501,470
Anantnag1,4301,550
Badamibagh1,4401,550
Bandipura1,4401,560
Baramula1,4201,540
Bijbehara1,4401,560
Doda1,4201,540
Dooru Verinag1,4601,580
Ganderbal1,4301,550
Jammu1,3601,470
Jammu Cantonment1,3601,470
Kathua1,3201,420
Kishtwar1,4801,580
Kulgam1,4601,590
Pampur1,4601,580
Pulwama1,4301,560
Punch1,3601,480
Rajaori1,3601,480
Samba1,3501,450
Sopur1,3901,520
Srinagar1,4401,570
Udhampur1,3501,470

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Jammu and Kashmir

Is net metering available for factories and commercial buildings in Jammu and Kashmir?

In Jammu and Kashmir, eligible consumers of all categories, commercial and industrial included, can set up a renewable energy system under net metering up to 500 kW. Net billing covers systems above 500 kW and up to 1 MW. The rules are in JERC's Grid Interactive Renewable Energy System regulations, 2023 (notified on 29 May 2023). They were amended once, on 28 June 2024.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Jammu and Kashmir

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image