Somaya Solar Solutions Limited builds ground-mounted solar power plants in Karnataka for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Karnataka
Solar output changes across Karnataka with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,300 to 1,430 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Ballari | 1,390 | 1,400 |
| Belagavi | 1,370 | 1,400 |
| Bengaluru | 1,410 | 1,410 |
| Bidar | 1,370 | 1,400 |
| Davangere | 1,380 | 1,400 |
| Hosapete | 1,400 | 1,420 |
| Hubballi | 1,370 | 1,390 |
| Kalaburagi | 1,370 | 1,400 |
| Mangaluru | 1,280 | 1,300 |
| Mysuru | 1,370 | 1,380 |
| Raichur | 1,390 | 1,410 |
| Shivamogga | 1,350 | 1,360 |
| Tumkur | 1,400 | 1,410 |
| Vijayapura | 1,410 | 1,430 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Karnataka
The Karnataka Renewable Energy Policy 2022-2027 is the state's current policy for solar and other renewable projects. The Energy Department notified it on 16 April 2022. It is valid for five years or until a new policy is announced. No later policy was found.
- Target: 10 GW of additional renewable projects, including up to 1 GW of rooftop solar.
- Karnataka Renewable Energy Development Limited (KREDL) is the nodal agency that processes project applications. The distribution companies are the nodal agency for rooftop solar.
- Commercial and industrial rooftop plants are promoted through net metering and gross metering, administered by the distribution companies.
- Captive and group captive solar projects have no minimum size. A solar project of 1 MWac or more counts as a MW-scale grid-connected project.
Under KERC's Open Access Regulations, 2025 (26 March 2025), a consumer with a contract demand of 100 kW or more on HT, or a sanctioned load of 100 kW or more on LT, can take power through open access. The High Court of Karnataka struck down the Green Energy Open Access Regulations, 2022. The 2025 regulations replace the 2004 open access regulations.
- Captive consumers have no load limit.
- Banking is monthly. The banking charge is 8% of the banked energy, taken in kind. Unused banked energy does not carry forward to the next month.
- For HT-2(a) industrial consumers the Tariff Order 2025 sets a cross-subsidy surcharge of 186 paise (₹1.86) per unit for FY2026-27. It does not apply to power from a captive plant for own use. Confirm the current figure with the distribution company.
- The Tariff Order 2025 says no additional surcharge is levied until BESCOM files a petition for all the distribution companies and KERC passes an order. No such order was found.
- Open access consumers may now also join the Discounted Energy Rate Scheme (₹5 per unit above base consumption) for FY2026-27 and FY2027-28. They then lose the extra 20% contract demand allowance.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Karnataka
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Karnataka
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- KERC (Terms and Conditions for Open Access) Regulations, 2025 (26 March 2025), KERC Combined Tariff Order 2025 (27 March 2025) and KERC order of 31 March 2026
- Karnataka Renewable Energy Policy 2022-2027, Energy Department notification of 16 April 2022 (Karnataka Gazette, 6 May 2022)
- PVGIS, European Commission Joint Research Centre (solar output model)