Solar EPC Company in Maharashtra

Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Maharashtra. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Maharashtra at a glance for solar projects

Electricity regulatorMaharashtra Electricity Regulatory Commission (MERC)
State renewable energy agencyMaharashtra Energy Development Agency (MEDA)
Electricity distributionMSEDCL (Throughout Maharashtra, and a few suburbs of Mumbai city. Torrent Power runs distribution as MSEDCL's franchisee in the Bhiwandi circle and in the Shil, Mumbra and Kalwa sub-divisions of Thane, and CESC Limited does so in Malegaon. These areas stay within MSEDCL's licence.); AEML (Parts of Mumbai. Licence for 25 years from 16 August 2011.); Tata Power-D (In and around Mumbai, with a city licence area and a suburban licence area. Its area overlaps those of BEST and AEML. Licence valid to 14 August 2039.); BEST (The island city of Mumbai.); AEML SEEPZ (Only the Santacruz Electronics Export Processing Zone SEZ, Andheri (East), Mumbai.); MBPPL (Only its IT/ITeS SEZ at Airoli, Trans-Thane Creek Industrial Area, Thane district.); GEPL (Only its IT/ITES SEZ at Airoli Knowledge Park, Trans-Thane Creek Industrial Area, Thane district.); KRCIPPL (Only its IT/ITES SEZ at Kharadi, Haveli taluka, Pune district.); EON Kharadi (Only its two IT/ITES SEZs (Phase I and Phase II) at Kharadi, Pune.); SEZ Bio-Tech (Only its two biotech and pharmaceutical SEZs at Manjari Budruk and Hadapsar, Pune district.); JNPA (Only the SEZ at Jawaharlal Nehru Port, Uran taluka, Raigad district.); LBSCML (Only its FTWZ and IT/ITES SEZ at Village Sai, Panvel taluka, Raigad district.); NUPLLP (Only the multi-services SEZ at Panvel, Raigad district.); MADC (Only the notified SEZ area at MIHAN, Nagpur.); MITL (Shendra) (Only the Shendra Industrial Area of Aurangabad Industrial City (AURIC). MITL is exempt from needing a distribution licence there under section 13 of the Electricity Act; MERC sets its tariff.); MITL (Bidkin) (Only the Bidkin Industrial Area of Aurangabad Industrial City (AURIC). MITL is exempt from needing a distribution licence there under section 13 of the Electricity Act; MERC sets its tariff.)
State solar policyMaharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36 (Government Resolution of 18 March 2026, in force until 31 March 2036)
Rooftop metering for businessesNet metering up to 5 MW or the contract demand, whichever is lower; net billing and gross metering also allowed

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Maharashtra

In Maharashtra, consumers of every category, including commercial and industrial, can install a rooftop or on-premises renewable system under net metering, net billing or gross metering. Under net metering the system may be up to 5 MW or the consumer's contract demand or sanctioned load, whichever is lower. Under the other arrangements it may be up to the contract demand or sanctioned load. The rules are in MERC's Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019, as amended in November 2023 and August 2024.

  • The total capacity of systems on one distribution transformer or feeder may not exceed 70% of its rated capacity, unless the licensee allows more after a detailed load study.
  • Under net metering, surplus units are carried forward from month to month. Units still unadjusted at the end of the financial year are bought by the licensee at MERC's generic tariff for that year.
  • Under net billing, the consumer pays the retail tariff for energy drawn from the grid and is credited for energy injected at MERC's generic tariff for that year.
  • Group net metering lets one consumer adjust surplus energy against its other connections in the same licensee's area. Wheeling charges and losses on such transfers are waived until rooftop solar in the state reaches 5,000 MW. Virtual net metering, added in August 2024, is only for residential consumers in multi-storey buildings.
  • Grid support charges apply to all net metering systems, except for consumers with a sanctioned load up to 10 kW, once rooftop capacity in the state reaches 5,000 MW. In its order of 25 March 2026, MERC set MSEDCL's charge for HT consumers at ₹1.42 per unit for 2026-27, levied on generated units. MSEDCL told MERC on 20 February 2026 that the state had reached 5,178.81 MW. Once the charge is levied, MSEDCL's banking charge stops. That charge applies to net metering systems commissioned in MSEDCL's area from 30 March 2020 and takes 7.5% of the energy injected by systems on the HT network.
  • For MSEDCL consumers on time-of-day billing, energy injected in solar hours (9 AM to 5 PM) can only be set off in solar hours. This applies to net metering and net billing. Residential net metering consumers are exempt.
  • MERC's practice direction of 30 June 2026 replaced the separate signed agreement with acceptance of the agreement terms in the online application, for all rooftop applications.
  • MERC published draft new Grid Interactive Rooftop Regulations, 2026 on 21 September 2026. Comments closed on 26 October 2026. They are not yet in force.

What a plant produces in Maharashtra

Solar output changes across Maharashtra with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,300 to 1,420 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Achalpur1,3401,390
Ahilyanagar1,4001,440
Ahmadpur1,3601,390
Akalkot1,3801,400
Akluj1,4001,430
Akola1,3701,410
Akot1,3501,400
Alandi1,3701,400
Alibag1,4001,440
Amalner1,3701,420
Ambad1,3801,420
Ambajogai1,3701,400
Ambarnath1,3201,360
Amravati1,3601,410
Anjangaon1,3601,400
Arvi1,3601,400
Ashta1,3601,390
Aurangabad1,3801,420
Ausa1,3601,390
Badlapur1,3101,350
Balapur1,3701,410
Ballarpur1,3401,380
Baramati1,4001,430
Barshi1,3901,420
Basmat1,3701,400
Beed1,3801,410
Bhadgaon1,3801,420
Bhadravati1,3501,390
Bhandara1,3501,400
Bhiwandi1,3201,360
Bhokar1,3601,400
Bhokardan1,3801,420
Bhusawal1,3701,420
Boisar1,3601,400
Bramhapuri1,3401,380
Buldana1,3901,430
Chakan1,3701,410
Chalisgaon1,3801,420
Chandur1,3401,380
Chikhli1,3801,420
Chiplun1,3001,330
Chopda1,3701,410
Dahanu1,3801,420
Darwha1,3701,410
Daryapur1,3601,400
Dattapur1,3601,400
Daund1,4001,430
Deglur1,3701,400
Dehu Road1,3401,380
Desaiganj1,3401,380
Deulgaon Raja1,3801,420
Dharangaon1,3701,410
Dharashiv1,3801,410
Dharmabad1,3601,400
Dharur1,3801,410
Dhule1,3801,430
Digras1,3701,410
Dombivali1,3201,360
Dondaicha1,3801,430
Erandol1,3801,420
Faizpur1,3701,420
Gadhinglaj1,3701,390
Gangakher1,3601,400
Gangapur1,3801,420
Garhchiroli1,3301,370
Gevrai1,3801,420
Ghatanji1,3601,400
Ghoti Budrukh1,3601,400
Ghugus1,3401,380
Ghulewadi1,4001,440
Godoli1,3501,380
Gondia1,3401,390
Hadgaon1,3601,400
Hinganghat1,3501,390
Hingoli1,3801,410
Hudkeshwar Buzurg1,3501,400
Hupari1,3701,390
Ichalkaranji1,3701,390
Igatpuri1,3501,390
Jaisingpur1,3801,400
Jalgaon1,3701,410
Jalgaon Jamod1,3601,410
Jalna1,3801,410
Jamkhed1,3801,410
Jamner1,3801,420
Jintur1,3701,410
Junnar1,3801,420
Kabnur1,3701,390
Kagal1,3701,400
Kaij1,3701,410
Kalamnuri1,3701,410
Kalyan1,3201,360
Kamthi1,3501,400
Kandahar1,3701,400
Kanhan1,3501,400
Kannad1,3901,430
Karad1,3401,370
Karanja1,3701,410
Karjat1,3101,340
Karmala1,3901,420
Katol1,3601,400
Khaira1,3601,400
Khamgaon1,3801,420
Kharghar1,3301,360
Khopoli1,3101,350
Kinwat1,3601,400
Kodoli1,3501,390
Kolhapur1,3301,360
Kopargaon1,4001,430
Korochi1,3701,390
Kurandvad1,3801,400
Kurduvadi1,3901,420
Latur1,3601,400
Loha1,3601,400
Lohara1,3701,410
Lonar1,3701,410
Lonavla1,3201,360
Mahad1,3201,350
Mahadula1,3501,400
Majalgaon1,3701,400
Mangalvedha1,4101,430
Mangrul Pir1,3701,410
Manmad1,4001,440
Manwath1,3801,410
Mehkar1,3801,420
Mharal Bk1,3201,360
Mhaswad1,4201,450
Mira and Bhayander1,3601,400
Morsi1,3501,390
Mudkhed1,3601,400
Mukher1,3601,390
Mul1,3401,380
Mumbai1,3801,420
Murtajapur1,3701,410
Nagpur1,3501,400
Nanded Waghala1,3601,400
Nandgaon1,3901,430
Nandura1,3801,420
Nandurbar1,3901,440
Narkher1,3501,400
Nashik1,3901,430
Navapur1,3801,420
Navi Mumbai1,3301,370
Ner1,3701,410
Nilanga1,3501,390
Nildoh1,3501,400
Ozar1,3901,430
Pachgaon1,3301,360
Pachora1,3801,420
Paithan1,3901,420
Palghar1,3601,400
Pandharkawada1,3601,400
Pandharpur1,4101,440
Parbhani1,3701,400
Parli Vaijnath1,3701,400
Parola1,3801,420
Partur1,3801,410
Pathardi1,3901,420
Pathri1,3801,410
Patur1,3701,420
Pawni1,3501,390
Pen1,3301,370
Phaltan1,4001,430
Pimpri-Chinchwad1,3701,400
Pulgaon1,3601,400
Pune1,3701,410
Purna1,3701,400
Pusad1,3701,410
Rahata1,4001,430
Rahuri1,4001,430
Rajgurunagar1,3801,410
Rajura1,3401,380
Ramtek1,3501,400
Ranjangaon S1,3801,420
Ratnagiri1,3401,370
Raver1,3701,420
Risod1,3801,420
Roha1,3101,350
Sakri1,4001,440
Sangamner1,4001,440
Sangli1,3801,410
Sangola1,4201,440
Saoner1,3501,400
Sasvad1,4001,440
Satana1,3901,440
Satara1,3401,370
Savantvadi1,3001,330
Savda1,3701,420
Selu1,3801,410
Shahada1,3801,430
Shahuwadi1,3101,340
Shegaon1,3801,420
Shendurjana1,3401,390
Shirdi1,3901,430
Shirpur1,3701,420
Shrigonda1,4001,430
Shrirampur1,3901,420
Sillod1,3901,430
Sindi1,3601,400
Sinnar1,3901,430
Sirur1,4001,430
Solapur1,4001,420
Talegaon Dabhade1,3401,380
Taloda1,3801,420
Tasgaon1,3801,410
Telhara1,3601,400
Thane1,3601,400
Tirora1,3401,390
Tuljapur1,3701,400
Tumsar1,3501,390
Udgir1,3601,390
Ulhasnagar1,3201,360
Umarga1,3601,390
Umarkhed1,3601,400
Umarsera1,3701,410
Umred1,3501,400
Uran1,3801,420
Urun-Islampur1,3601,390
Vaijapur1,3801,420
Varangaon1,3701,420
Vasind1,3101,350
Virar1,3601,400
Vite1,3901,420
Wadgaon1,3701,390
Wadgaon Kolhati1,3801,420
Wai1,3501,390
Waluj Buzurg1,3801,420
Walwadi1,3801,430
Wanadongri1,3501,400
Wani1,3501,390
Wardha1,3601,400
Warora1,3501,390
Warud1,3501,400
Washim1,3801,420
Yaval1,3701,410
Yavatmal1,3701,410
Yeola1,4001,440

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Maharashtra

Is net metering available for factories and commercial buildings in Maharashtra?

In Maharashtra, consumers of every category, including commercial and industrial, can install a rooftop or on-premises renewable system under net metering, net billing or gross metering. Under net metering the system may be up to 5 MW or the consumer's contract demand or sanctioned load, whichever is lower. Under the other arrangements it may be up to the contract demand or sanctioned load. The rules are in MERC's Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019, as amended in November 2023 and August 2024.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Maharashtra

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image