PM-KUSUM Solar Plant EPC in Jharkhand

Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Jharkhand and what we do on such a project.

What PM-KUSUM covers

PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components.

  • Component A: decentralised solar plants of up to 2 MW on farmers' land.
  • Component B: solar pumps for agriculture.
  • Component C: solarisation of grid-connected agriculture pumps, including feeder-level solarisation.

Who runs PM-KUSUM in Jharkhand

In Jharkhand, JREDA, the state nodal agency, runs Component B (standalone solar pumps) and farmers apply on the state PM-KUSUM portal.

  • Progress reported to the Lok Sabha up to 30 June 2026: nothing under Component A and nothing under Component C in Jharkhand.
  • Under Component B, the same answer shows 68,787 solar pumps installed between 2020-21 and 2026-27 (up to 30 June 2026), including 25,378 in 2025-26 and 11,126 in 2026-27.
  • The central government has extended the scheme to 31 March 2027 for all components.

What a PM-KUSUM plant produces in Jharkhand

Solar output changes across Jharkhand with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,330 to 1,430 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Barki Saria1,3501,410
Bishrampur1,3701,430
Bokaro1,3401,390
Bundu1,3301,380
Chaibasa1,3201,370
Chakradharpur1,3201,370
Chandrapura1,3401,390
Chas1,3401,390
Chatra1,3601,420
Chirkunda1,3201,380
Chitarpur1,3401,400
Churi1,3601,420
Deoghar1,3301,390
Dhanbad1,3301,380
Dugda1,3401,390
Dumka1,3101,370
Garhwa1,3601,420
Ghatsila1,3101,360
Giridih1,3401,400
Godda1,3101,370
Gomoh1,3301,390
Gumia1,3401,390
Gumla1,3501,400
Hazaribagh1,3601,420
Husainabad1,3701,430
Jamshedpur1,3201,370
Jamtara1,3201,380
Jaridih1,3301,390
Jhumri Telaiya1,3601,430
Kathhara1,3401,390
Khalari1,3601,420
Khunti1,3401,390
Kodarma1,3601,430
Kuju1,3401,400
Latehar1,3401,400
Lohardaga1,3501,410
Madhupur1,3301,390
Medininagar1,3601,420
Mushabani1,3101,360
Pakur1,2801,350
Patratu1,3501,410
Phusro1,3301,390
Rajmahal1,2701,330
Ranchi1,3501,400
Ratu1,3601,420
Sahibganj1,2801,350
Saunda1,3501,410
Simdega1,3301,390
Siuliban1,3201,380

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What Somaya Solar does on a PM-KUSUM plant

Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.

  • Site check of the land and its distance from the substation
  • Plant design and equipment supply
  • Installation, testing and commissioning
  • The line to the substation and coordination with the electricity supplier
  • Support with the documents the implementing agency asks for

More detail: PM-KUSUM across India.

Questions about solar projects in Jharkhand

Who do I apply to for PM-KUSUM in Jharkhand?

In Jharkhand, JREDA, the state nodal agency, runs Component B (standalone solar pumps) and farmers apply on the state PM-KUSUM portal.

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Jharkhand

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.