Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Himachal Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Himachal Pradesh at a glance for solar projects
| Electricity regulator | Himachal Pradesh Electricity Regulatory Commission (HPERC) |
|---|---|
| State renewable energy agency | Himachal Pradesh Energy Development Agency (HIMURJA) |
| Electricity distribution | HPSEBL (the whole state) |
| State solar policy | Swaran Jayanti Energy Policy, 2021 (notified on 20 January 2022, as amended) |
| Rooftop metering for businesses | Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Himachal Pradesh
In Himachal Pradesh a consumer of HPSEBL can install rooftop solar under net metering up to 50 kWp. A system above 50 kWp and up to 1 MWp goes under net billing. The rules are in HPERC's Rooftop Solar PV Grid Interactive System Regulations, 2015, as amended four times, most recently on 19 August 2026.
- A consumer on a two-part tariff, such as a large industrial consumer, may install up to 80% of the sanctioned contract demand.
- The system may not normally exceed 1 MWp for supply at 11 kV or higher, 20 kWp for three-phase LT supply and 10 kWp for single-phase LT supply.
- Under net billing, imports and exports are metered separately and are not set off against each other. For systems approved on or after 1 September 2022, HPSEBL values the exported energy at 50% of the weighted average rate at which it bought power from ground-mounted solar plants of up to 5 MW in the state. The percentage is lower if the system received a subsidy.
- For a net billing consumer on a two-part tariff, the adjustment is done in kVAh.
- The settlement period is up to 12 billing months, starting from 16 March.
- Group metering is allowed for systems above 20 kWp and up to 1 MWp. All participating consumers must be in the same building, on a single-part tariff and fed from a common distribution transformer at the same voltage. HPSEBL deducts 9% of the energy it receives before crediting it.
- No technical feasibility study is needed for systems up to 10 kW. Above 10 kW, the study must be finished within 15 days, or the proposal is treated as feasible.
- HPSEBL must keep 30% spare capacity in its distribution system and augment any equipment that rooftop systems load beyond 70% of its rated capacity.
- The Fourth Amendment of 19 August 2026 changed only the application process. Consumers may apply by post, by hand or online, and HPSEBL must accept the digital agreement that is part of the online application form of a central or state scheme.
What a plant produces in Himachal Pradesh
Solar output changes across Himachal Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,330 to 1,370 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Baddi | 1,370 | 1,480 |
| Chamba | 1,370 | 1,460 |
| Dharamshala | 1,360 | 1,470 |
| Mandi | 1,330 | 1,440 |
| Nahan | 1,360 | 1,460 |
| Paonta Sahib | 1,360 | 1,460 |
| Shimla | 1,350 | 1,440 |
| Solan | 1,370 | 1,470 |
| Sundarnagar | 1,340 | 1,450 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Himachal Pradesh
Is net metering available for factories and commercial buildings in Himachal Pradesh?
In Himachal Pradesh a consumer of HPSEBL can install rooftop solar under net metering up to 50 kWp. A system above 50 kWp and up to 1 MWp goes under net billing. The rules are in HPERC's Rooftop Solar PV Grid Interactive System Regulations, 2015, as amended four times, most recently on 19 August 2026.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Himachal Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- HPERC (Rooftop Solar PV Grid Interactive System) (Third Amendment) Regulations, 2024, clause 22A, which names HIMURJA as a State Nodal Agency
- HPERC (Rooftop Solar PV Grid Interactive System) Regulations, 2015, with the First Amendment of 6 November 2018, the Second Amendment of 14 September 2022, the Third Amendment of 12 June 2024 and the Fourth Amendment of 19 August 2026
- HPERC orders of 22 July 2026 (Petition No. 121 of 2026), 9 October 2026 (Petition No. 179 of 2026) and 22 March 2025 (Petition No. 20 of 2025), which apply the Swaran Jayanti Energy Policy, 2021; Directorate of Energy, Government of Himachal Pradesh, scheme for solar power projects above 5 MW (published 10 March 2026)
- HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026 (paragraph 1.1.4: HPSEBL is the deemed licensee for distribution and supply in the state); HPSEBL organisation chart and list of electrical sub-divisions (hpseb.in)
- Himachal Pradesh Electricity Regulatory Commission
- PVGIS, European Commission Joint Research Centre (solar output model)