Turnkey Solar EPC Solutions in Himachal Pradesh

Somaya Solar Solutions Limited delivers turnkey solar projects in Himachal Pradesh: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Himachal Pradesh

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Himachal Pradesh

In Himachal Pradesh a consumer of HPSEBL can install rooftop solar under net metering up to 50 kWp. A system above 50 kWp and up to 1 MWp goes under net billing. The rules are in HPERC's Rooftop Solar PV Grid Interactive System Regulations, 2015, as amended four times, most recently on 19 August 2026.

  • A consumer on a two-part tariff, such as a large industrial consumer, may install up to 80% of the sanctioned contract demand.
  • The system may not normally exceed 1 MWp for supply at 11 kV or higher, 20 kWp for three-phase LT supply and 10 kWp for single-phase LT supply.
  • Under net billing, imports and exports are metered separately and are not set off against each other. For systems approved on or after 1 September 2022, HPSEBL values the exported energy at 50% of the weighted average rate at which it bought power from ground-mounted solar plants of up to 5 MW in the state. The percentage is lower if the system received a subsidy.
  • For a net billing consumer on a two-part tariff, the adjustment is done in kVAh.
  • The settlement period is up to 12 billing months, starting from 16 March.
  • Group metering is allowed for systems above 20 kWp and up to 1 MWp. All participating consumers must be in the same building, on a single-part tariff and fed from a common distribution transformer at the same voltage. HPSEBL deducts 9% of the energy it receives before crediting it.
  • No technical feasibility study is needed for systems up to 10 kW. Above 10 kW, the study must be finished within 15 days, or the proposal is treated as feasible.
  • HPSEBL must keep 30% spare capacity in its distribution system and augment any equipment that rooftop systems load beyond 70% of its rated capacity.
  • The Fourth Amendment of 19 August 2026 changed only the application process. Consumers may apply by post, by hand or online, and HPSEBL must accept the digital agreement that is part of the online application form of a central or state scheme.

What to expect from the plant in Himachal Pradesh

Solar output changes across Himachal Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,330 to 1,370 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Baddi1,3701,480
Chamba1,3701,460
Dharamshala1,3601,470
Mandi1,3301,440
Nahan1,3601,460
Paonta Sahib1,3601,460
Shimla1,3501,440
Solan1,3701,470
Sundarnagar1,3401,450

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Himachal Pradesh

Is net metering available for factories and commercial buildings in Himachal Pradesh?

In Himachal Pradesh a consumer of HPSEBL can install rooftop solar under net metering up to 50 kWp. A system above 50 kWp and up to 1 MWp goes under net billing. The rules are in HPERC's Rooftop Solar PV Grid Interactive System Regulations, 2015, as amended four times, most recently on 19 August 2026.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Himachal Pradesh

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image