Commercial and Industrial Rooftop Solar in Punjab

Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Punjab. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Metering rules for business rooftops in Punjab

In Punjab, commercial and industrial consumers can use net metering for a rooftop plant from 1 kWp up to their sanctioned load or contract demand, with a ceiling of 500 kWp. The regulator set this in the third amendment to its 2021 rooftop regulations, notified on 7 April 2026. Before that, a non-domestic consumer could install only up to 70% of the sanctioned load.

  • Net billing and behind-the-meter plants can go up to the sanctioned load or contract demand, with no 500 kWp ceiling. A behind-the-meter plant is not paid for any power it sends to the grid.
  • Gross metering starts at 5 kWp and can go up to the sanctioned load or contract demand.
  • Group net metering, in force from 1 July 2026, lets one plant of 5 kWp to 500 kWp serve the same consumer's other connections of the same category. Virtual net metering is for domestic consumers only.
  • A consumer can choose only one arrangement. Under net metering, credits left at the end of the settlement period are paid at 75% of the feed-in tariff, which is ₹2.97 per unit for 2026-27.
  • The total rooftop capacity connected to one distribution transformer or feeder may not exceed 80% of its rated capacity.

Output and bill value for a rooftop plant in Punjab

Solar output changes across Punjab with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,310 to 1,450 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Abohar1,4501,550
Adampur1,3801,480
Ahmedgarh1,4101,510
Ajnala1,3701,470
Amritsar1,3801,480
Bagha Purana1,4101,510
Balachor1,3801,480
Banga1,3901,490
Barnala1,4101,510
Batala1,3601,470
Bathinda1,4301,530
Bhawanigarh1,4101,500
Budhlada1,4301,530
Dasuya1,3501,450
Dera Bassi1,3901,500
Dhariwal1,3601,460
Dhuri1,4101,510
Dinanagar1,3401,440
Doraha1,4001,500
Faridkot1,4201,520
Fazilka1,4401,540
Firozpur1,4101,510
Giddarbaha1,4401,540
Gobindgarh1,4001,500
Gurdaspur1,3401,440
Hoshiarpur1,3601,460
Jagraon1,4001,500
Jaito1,4301,530
Jalalabad1,4201,520
Jalandhar1,3801,480
Jandiala Guru1,3701,470
Kapurthala1,3801,480
Kartarpur1,3801,480
Khanna1,4001,500
Kot Kapura1,4201,520
Kotkapura1,4201,520
Kurali1,3901,490
Lalru1,4001,510
Laungowal1,4201,520
Lehragaga1,4301,530
Longowal1,4201,520
Ludhiana1,4001,500
Machhiwara1,3901,500
Maler Kotla1,4001,500
Malout1,4501,540
Mansa1,4301,530
Maur1,4301,520
Moga1,4001,500
Mohali1,4001,500
Morinda1,3901,500
Mukerian1,3501,450
Muktsar1,4301,530
Nabha1,4101,510
Nakodar1,3901,490
Nangal1,3601,470
Nawanshahr1,3901,490
Naya Gaon1,3701,480
Pathankot1,3101,420
Patiala1,4001,500
Patran1,4201,520
Patti1,3901,490
Phagwara1,3901,490
Phillaur1,3901,490
Qadian1,3601,460
Raikot1,4101,510
Rajpura1,4001,510
Raman1,4401,540
Rampura1,4201,520
Rampura Phul1,4201,520
Ropar1,3801,490
Samana1,4201,510
Sanaur1,4101,510
Sanehwal1,4001,500
Sangrur1,4201,520
Sirhind1,4001,500
Sujanpur1,3201,430
Sunam1,4201,520
Talwandi Sabo1,4401,540
Talwara1,3401,440
Tapa1,4201,520
Tarn Taran1,3901,490
Urmar1,3701,470
Zerakpur1,3901,500
Zira1,4101,510

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Questions about solar projects in Punjab

Is net metering available for factories and commercial buildings in Punjab?

In Punjab, commercial and industrial consumers can use net metering for a rooftop plant from 1 kWp up to their sanctioned load or contract demand, with a ceiling of 500 kWp. The regulator set this in the third amendment to its 2021 rooftop regulations, notified on 7 April 2026. Before that, a non-domestic consumer could install only up to 70% of the sanctioned load.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Punjab

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image