Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Punjab as an EPC contractor: engineering, supply, construction and commissioning.

What Punjab's policy says about large solar plants

Punjab's renewable energy policy is the New and Renewable Sources of Energy (NRSE) Policy, 2012. It was notified on 26 December 2012 and amended on 9 July 2015. It stays in operation until the government notifies a new policy, and a draft state policy published in 2026 still relies on it.

  • The targets in the policy run to 2022: renewable sources at 10% of the state's installed power capacity, including 1,000 MW of solar.
  • Punjab Energy Development Agency (PEDA) is the nodal agency. All renewable project developers, including captive ones, submit their proposals to PEDA.
  • The policy promotes rooftop solar for domestic, industrial and commercial consumers through net metering or sale of power to PSPCL.
  • Power that a renewable generator produces and uses itself as a captive unit is exempt from electricity duty under the policy.
  • Farm land may be used for a renewable power project without change-of-land-use charges, and the land lease or registration is free of stamp duty and fee.

Punjab has no separate green energy open access regulation. The rules sit in the PSERC Intra-State Open Access Regulations, 2011, last changed by the 13th amendment of 12 May 2026. A consumer with a sanctioned contract demand of 100 kVA or more can take renewable power through open access. Connections in the same electricity division can be added together to reach 100 kVA.

  • There is no load or demand limit for a captive user taking power through green energy open access.
  • Up to 30% of the month's consumption from PSPCL can be banked. Banked energy carries forward month to month until 31 May and then lapses. It cannot be drawn in the peak season or in peak hours.
  • The banking charge is taken in units at a rate the regulator approves. PSERC set 10% for captive solar plants in its order of 19 April 2023, and PSPCL's banking procedure for green energy open access consumers, published in September 2025, uses the same 10%.
  • For 2026-27 the tariff order sets a cross-subsidy surcharge of ₹0.86 per unit for Large Supply consumers. Captive users do not pay the cross-subsidy surcharge or the additional surcharge.
  • The additional surcharge is ₹1.13 per unit on open access beyond the contract demand kept with PSPCL. This rate was set on 11 June 2026 and continues provisionally from 1 October 2026. A green energy open access consumer who pays fixed charges to PSPCL does not pay it within the contract demand.
  • Renewable power wheeled for use within Punjab pays transmission and wheeling charges in kind, at 2% of the energy injected, whatever the distance.

Output and land at megawatt scale in Punjab

Solar output changes across Punjab with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,420 to 1,550 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Abohar1,4501,550
Adampur1,3801,480
Ahmedgarh1,4101,510
Ajnala1,3701,470
Amritsar1,3801,480
Bagha Purana1,4101,510
Balachor1,3801,480
Banga1,3901,490
Barnala1,4101,510
Batala1,3601,470
Bathinda1,4301,530
Bhawanigarh1,4101,500
Budhlada1,4301,530
Dasuya1,3501,450
Dera Bassi1,3901,500
Dhariwal1,3601,460
Dhuri1,4101,510
Dinanagar1,3401,440
Doraha1,4001,500
Faridkot1,4201,520
Fazilka1,4401,540
Firozpur1,4101,510
Giddarbaha1,4401,540
Gobindgarh1,4001,500
Gurdaspur1,3401,440
Hoshiarpur1,3601,460
Jagraon1,4001,500
Jaito1,4301,530
Jalalabad1,4201,520
Jalandhar1,3801,480
Jandiala Guru1,3701,470
Kapurthala1,3801,480
Kartarpur1,3801,480
Khanna1,4001,500
Kot Kapura1,4201,520
Kotkapura1,4201,520
Kurali1,3901,490
Lalru1,4001,510
Laungowal1,4201,520
Lehragaga1,4301,530
Longowal1,4201,520
Ludhiana1,4001,500
Machhiwara1,3901,500
Maler Kotla1,4001,500
Malout1,4501,540
Mansa1,4301,530
Maur1,4301,520
Moga1,4001,500
Mohali1,4001,500
Morinda1,3901,500
Mukerian1,3501,450
Muktsar1,4301,530
Nabha1,4101,510
Nakodar1,3901,490
Nangal1,3601,470
Nawanshahr1,3901,490
Naya Gaon1,3701,480
Pathankot1,3101,420
Patiala1,4001,500
Patran1,4201,520
Patti1,3901,490
Phagwara1,3901,490
Phillaur1,3901,490
Qadian1,3601,460
Raikot1,4101,510
Rajpura1,4001,510
Raman1,4401,540
Rampura1,4201,520
Rampura Phul1,4201,520
Ropar1,3801,490
Samana1,4201,510
Sanaur1,4101,510
Sanehwal1,4001,500
Sangrur1,4201,520
Sirhind1,4001,500
Sujanpur1,3201,430
Sunam1,4201,520
Talwandi Sabo1,4401,540
Talwara1,3401,440
Tapa1,4201,520
Tarn Taran1,3901,490
Urmar1,3701,470
Zerakpur1,3901,500
Zira1,4101,510

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Questions about solar projects in Punjab

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Punjab

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image