Somaya Solar Solutions Limited builds ground-mounted solar power plants in Punjab for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Punjab
Solar output changes across Punjab with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,420 to 1,550 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Abohar | 1,450 | 1,550 |
| Adampur | 1,380 | 1,480 |
| Ahmedgarh | 1,410 | 1,510 |
| Ajnala | 1,370 | 1,470 |
| Amritsar | 1,380 | 1,480 |
| Bagha Purana | 1,410 | 1,510 |
| Balachor | 1,380 | 1,480 |
| Banga | 1,390 | 1,490 |
| Barnala | 1,410 | 1,510 |
| Batala | 1,360 | 1,470 |
| Bathinda | 1,430 | 1,530 |
| Bhawanigarh | 1,410 | 1,500 |
| Budhlada | 1,430 | 1,530 |
| Dasuya | 1,350 | 1,450 |
| Dera Bassi | 1,390 | 1,500 |
| Dhariwal | 1,360 | 1,460 |
| Dhuri | 1,410 | 1,510 |
| Dinanagar | 1,340 | 1,440 |
| Doraha | 1,400 | 1,500 |
| Faridkot | 1,420 | 1,520 |
| Fazilka | 1,440 | 1,540 |
| Firozpur | 1,410 | 1,510 |
| Giddarbaha | 1,440 | 1,540 |
| Gobindgarh | 1,400 | 1,500 |
| Gurdaspur | 1,340 | 1,440 |
| Hoshiarpur | 1,360 | 1,460 |
| Jagraon | 1,400 | 1,500 |
| Jaito | 1,430 | 1,530 |
| Jalalabad | 1,420 | 1,520 |
| Jalandhar | 1,380 | 1,480 |
| Jandiala Guru | 1,370 | 1,470 |
| Kapurthala | 1,380 | 1,480 |
| Kartarpur | 1,380 | 1,480 |
| Khanna | 1,400 | 1,500 |
| Kot Kapura | 1,420 | 1,520 |
| Kotkapura | 1,420 | 1,520 |
| Kurali | 1,390 | 1,490 |
| Lalru | 1,400 | 1,510 |
| Laungowal | 1,420 | 1,520 |
| Lehragaga | 1,430 | 1,530 |
| Longowal | 1,420 | 1,520 |
| Ludhiana | 1,400 | 1,500 |
| Machhiwara | 1,390 | 1,500 |
| Maler Kotla | 1,400 | 1,500 |
| Malout | 1,450 | 1,540 |
| Mansa | 1,430 | 1,530 |
| Maur | 1,430 | 1,520 |
| Moga | 1,400 | 1,500 |
| Mohali | 1,400 | 1,500 |
| Morinda | 1,390 | 1,500 |
| Mukerian | 1,350 | 1,450 |
| Muktsar | 1,430 | 1,530 |
| Nabha | 1,410 | 1,510 |
| Nakodar | 1,390 | 1,490 |
| Nangal | 1,360 | 1,470 |
| Nawanshahr | 1,390 | 1,490 |
| Naya Gaon | 1,370 | 1,480 |
| Pathankot | 1,310 | 1,420 |
| Patiala | 1,400 | 1,500 |
| Patran | 1,420 | 1,520 |
| Patti | 1,390 | 1,490 |
| Phagwara | 1,390 | 1,490 |
| Phillaur | 1,390 | 1,490 |
| Qadian | 1,360 | 1,460 |
| Raikot | 1,410 | 1,510 |
| Rajpura | 1,400 | 1,510 |
| Raman | 1,440 | 1,540 |
| Rampura | 1,420 | 1,520 |
| Rampura Phul | 1,420 | 1,520 |
| Ropar | 1,380 | 1,490 |
| Samana | 1,420 | 1,510 |
| Sanaur | 1,410 | 1,510 |
| Sanehwal | 1,400 | 1,500 |
| Sangrur | 1,420 | 1,520 |
| Sirhind | 1,400 | 1,500 |
| Sujanpur | 1,320 | 1,430 |
| Sunam | 1,420 | 1,520 |
| Talwandi Sabo | 1,440 | 1,540 |
| Talwara | 1,340 | 1,440 |
| Tapa | 1,420 | 1,520 |
| Tarn Taran | 1,390 | 1,490 |
| Urmar | 1,370 | 1,470 |
| Zerakpur | 1,390 | 1,500 |
| Zira | 1,410 | 1,510 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Punjab
Punjab's renewable energy policy is the New and Renewable Sources of Energy (NRSE) Policy, 2012. It was notified on 26 December 2012 and amended on 9 July 2015. It stays in operation until the government notifies a new policy, and a draft state policy published in 2026 still relies on it.
- The targets in the policy run to 2022: renewable sources at 10% of the state's installed power capacity, including 1,000 MW of solar.
- Punjab Energy Development Agency (PEDA) is the nodal agency. All renewable project developers, including captive ones, submit their proposals to PEDA.
- The policy promotes rooftop solar for domestic, industrial and commercial consumers through net metering or sale of power to PSPCL.
- Power that a renewable generator produces and uses itself as a captive unit is exempt from electricity duty under the policy.
- Farm land may be used for a renewable power project without change-of-land-use charges, and the land lease or registration is free of stamp duty and fee.
Punjab has no separate green energy open access regulation. The rules sit in the PSERC Intra-State Open Access Regulations, 2011, last changed by the 13th amendment of 12 May 2026. A consumer with a sanctioned contract demand of 100 kVA or more can take renewable power through open access. Connections in the same electricity division can be added together to reach 100 kVA.
- There is no load or demand limit for a captive user taking power through green energy open access.
- Up to 30% of the month's consumption from PSPCL can be banked. Banked energy carries forward month to month until 31 May and then lapses. It cannot be drawn in the peak season or in peak hours.
- The banking charge is taken in units at a rate the regulator approves. PSERC set 10% for captive solar plants in its order of 19 April 2023, and PSPCL's banking procedure for green energy open access consumers, published in September 2025, uses the same 10%.
- For 2026-27 the tariff order sets a cross-subsidy surcharge of ₹0.86 per unit for Large Supply consumers. Captive users do not pay the cross-subsidy surcharge or the additional surcharge.
- The additional surcharge is ₹1.13 per unit on open access beyond the contract demand kept with PSPCL. This rate was set on 11 June 2026 and continues provisionally from 1 October 2026. A green energy open access consumer who pays fixed charges to PSPCL does not pay it within the contract demand.
- Renewable power wheeled for use within Punjab pays transmission and wheeling charges in kind, at 2% of the energy injected, whatever the distance.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Punjab
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Punjab
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- New and Renewable Sources of Energy (NRSE) Policy, 2012, Government of Punjab notification of 26 December 2012, with the amendment of 9 July 2015
- PSERC (Terms and Conditions for Intra-State Open Access) Regulations, 2011, 10th Amendment of 2 June 2023 to 13th Amendment of 12 May 2026; PSERC tariff order for 2026-27 dated 6 March 2026; PSERC additional surcharge orders of 11 June 2026 and 30 September 2026
- PVGIS, European Commission Joint Research Centre (solar output model)